Along with the $timer/HARNESS_TIMER option to print out the elapsed time for each test, would it be possible to include an option to print a date/time stamp at either the start or end of each test? We need to coordinate error logs from various systems with the failing tests run by Test::Harness and rather than add a line to each test, it would make sense to flip a switch in Test:Harness and I figure if I might need it, others might as well.
I would be very willing to contribute code to the effort since that would be way more efficient than re-writing 100's of tests in 5 different SW languages.